The team have installed the connection steel to SB3 installed yesterday, to support the chimney breast which is to be part demolished beneath with the top of the chimney remaining in situ.
Stockmore Street Chimney Steel installed
Previous
Previous
Stockmore street, floor structure in, steel installed.
Next
Next