Stockmore street, floor structure in, steel installed.

Block and beam and timber floors have now been installed. Steel moment frames installed. Next up is brickwork and membraned/taped insulation details for a breathable airtight wall and ceiling detail.

Previous
Previous

Internal floor structure completed

Next
Next

Stockmore Street Chimney Steel installed